Home / ADU guides / ADU cost

How much does an ADU cost in San Jose?

Updated November 2026

As of November 2026, Maxable's 2026 Bay Area figures put garage conversions at about $120,000 to $150,000 and detached ADUs at about $250,000 to $500,000 or more. We found no dated, San Jose-only survey. A preapproved design can trim design fees and time; the site still drives construction cost.

Published ranges

Maxable, Bay Area ADU guide (2026 table, page updated July 2026), checked November 2026
ADU typePublished range
Garage conversionAbout $120,000 to $150,000
Detached ADUAbout $250,000 to $500,000 or more; most standard builds about $300,000 to $450,000

These are published ranges, not a quote for your lot.

Compact kitchenette with light wood cabinets

What moves the number?

  • Utility runs. Distance to the sewer and whether the electrical panel needs an upgrade.
  • Foundation and soil. Slopes, expansive soil and tree roots.
  • Size and finishes. Kitchens and bathrooms carry the most cost per square foot.
  • Access. Narrow side yards slow every delivery.
  • Fees. Plan check and permit fees, plus school or utility fees on larger units.

What lowers it?

  • Keeping the unit at or under 750 square feet, which avoids impact fees under state law.
  • A simple roofline and a plan that fits the setbacks without custom engineering.
  • Converting existing space instead of building new, when the structure is sound.

Sources, checked November 2026: Maxable, "Building an ADU in the Bay Area"; California ADU fee provisions. Published ranges, not a quote.

Updated November 2026

Want us to check your lot?

Send your address. We check preapproved eligibility, zoning and utilities.

We build in San Jose, CA.

We use your details only to answer this request. Your address is never published.